 

Brazil, Itajaí

FC-01x Future Cities (Self-Paced) - Task 2

Uploaded on 2019-08-31 by André Nascimento Costa

As we can see, building are being constructed behind these trees. Buildings require a lot of infrastructure like eletricity, if there is no eletricity in construction site, there is no materials flow either, which entails in a giant delay in the execution of the building.