United Kingdom, Poole
FC-01x Future Cities (Self-Paced) - Exercise 1 : "Making the Invisible - Visible"
Uploaded on 2018-06-28 by Oliver Hewitt
• The road and path system towards the bus station and the bus station, shopping centre and arts centre buildings themselves • Traffic light control system and road barrier • The shopping centre and station are 3 storeys high and connected • the arts centre is 4 storeys high • There are signs and cones on the path and road, and lampposts spread between the lanes of the road. • There are cars travelling on the road and buses loading in the station. Invisible 1) The large amount of public transport in the area – the bus station is the hub for the More bus company and most bus services run from this station. The station is full, and could cause a high population density around this area. By measuring the amount of buses that pass through the station a day, which could be used to suggest expanding the station to better support the transport system and allow a greater amount of bus services per day. Invisible 2) The traffic flow along the road next to the station – this would be measured by the number of cars passing through the road at certain points of the day