Uploaded on 2020-07-11 by Naz
The excavation that emerged during the construction of this building, which I took from the internet, was completely used in cement production and 100% recycling was achieved. Other wastes generated during the demolition of the old building were evaluated at the factory's own waste disposal facility. As a result, 78% recycling was achieved.