Uploaded on 2014-12-10 by MicScu
[1]: https://edxuploads.s3.amazonaws.com/14181695419828797.jpg This building is being constructed from components manufactured in many different countries using expertise from many countries. The glazing is manufactured in Germany then shipped to France for a treatment called fritting, before it is laminated in Austria then shipped to site in London for assembly. The rubber gaskets and rigid insulation began their production as oil from the Middle East. The concrete frame and steel infill frame are manufactured from nationally available materials.