Uploaded on 2014-11-26 by GauravSardana
A GLOBALIZED ECONOMY - MATERIALS: The raked columns are imported from UK via sea to Mumbai (the steel being made from iron mined from Asia), the stone used for the plaza is quarried from western India, the glass facade and corresponding fixtures are made in India, the aluminum insulated walls are made from materials from East Asia, the lighting fixtures are from Germany. A GLOBALIZED ECONOMY - CONSTRUCTION PROCESSES: The architecture team behind this project is based out of Mumbai and western India, the engineering team is based of out of Delhi (India) and the UK, the fabricators are based out of Mumbai and the construction workers on the project were from northern and western India.][1] [1]: https://edxuploads.s3.amazonaws.com/14170338107992617.jpg