Uploaded on 2014-10-20 by chinmayingole
[1]: https://edxuploads.s3.amazonaws.com/14137960277873974.jpg the construction of this particular bridge has takne place due to globalisation. the technology used for building this bridge is not 100% Indian. many of the techniques were copied from the US. the construction required the largest floating crane in the world for a period of several months. it was leased from a European country (I am not sure what was the country of origin). the special purpose steel rods used for the construction were imported from US. anti-slide material used on the surface was also imported from US or Europe. thus, we see the global resources being pulled together to make this project happen.